TL;DR — The Service Acceptance Criteria, defined once: the standing Definition of Done every solution meets. Fixed categories; each organisation sets and ratifies its own thresholds. Non-normative here — the binding “shall” lives in FitSD — Requirements (the standing-baseline requirement and FSD-SD-4/5). This document defines the criteria;
FSD-PRO §7proves them; the forms design and evidence them (FSD-FRM-02 §5,FSD-FRM-03 §1).
The SAC are principles, not one org’s numbers
Section titled “The SAC are principles, not one org’s numbers”The SAC are best understood as standing, inheritable non-functional principles. The categories below are fixed. They are the shape of “operable” that FitSD holds every service to. The thresholds are not: every organisation’s acceptable service-quality bar differs — its availability target, its backup-test cadence, its continuity rule, what it counts as a reportable incident, its cost and licensing posture.
So an adopter shouldn’t inherit our numbers. They inherit the categories, then set their own thresholds once, ratify them as the organisation’s standing non-functional baseline, and inherit that baseline into every solution: designed to at Gate 2, proven at Service Acceptance. This is the shift-left of non-functional requirements: teams design to a known bar instead of discovering it at go-live.
Defining the set in one place is also what keeps it from drifting. The criteria are referenced by name wherever they appear; the set is versioned with the framework; no document states a count.
The criteria
Section titled “The criteria”Each criterion is described here by what it covers, stage-neutral. It is designed at Gate 2 (how the baseline will be met) and proven at Service Acceptance (evidence the baseline is met). Those stage-specific bars live on the forms, not here.
| Criterion | What it covers | What your baseline sets |
|---|---|---|
| Documentation | The service can be understood and operated from written material: design (carrying the key decisions and their rationale from delivery), runbook, recovery procedure, operating procedures (SOPs), user/how-to. | Which documents are mandatory, where they live, and how often they’re reviewed. |
| Backup (tested) | Data is recoverable, and recovery is demonstrated rather than assumed. | Backup scope, frequency, retention, location, and how often a restore is actually tested. |
| Security | The service is hardened, has a patch path, and its vulnerability posture is acceptable, with any departures recorded. | The hardening standard, patch timescales by severity, what “acceptable posture” means, and the key/secret-management standard services follow (ties to FSD-SA, incl. FSD-SA-6). |
| Access | Access follows least privilege, with joiners/movers/leavers handled and access reviewed. | The access model and the review cadence (ties to FSD-SA-2). |
| Availability | The service meets an agreed availability target, with capacity and disaster-recovery understood. | The availability target / SLO (by service tier, if you tier) and the DR position. |
| Monitoring & alerting | The service is observed, with thresholds and alert routing that work end to end. | What must be monitored, the thresholds, and where alerts route — checked against the support hours and response targets, so out-of-hours routing and due-by times agree. |
| Incident profile | What counts as an incident for this service is defined and registered with the incident process. | The severity scheme and the reportable-incident bar (satisfies FSD-RR-6). |
| Supportability / handover | An operating and support model exists; knowledge transfer / cross-training is done so continuity is assured (the service isn’t reliant on a single person) and any new or changed standing procedure the service forced (flagged at Gate 2 §4) has been written and adopted. | The support model — hours, response expectations by severity, who takes first contact, escalation path and cover, and how it’s communicated to the service’s customers; the continuity rule (no single-person dependency in the operating team or the support model, what evidences sufficient cross-training, and who attests it); and how operating-procedure changes are handled. |
| Cost / licensing | Licences are in place and ongoing run-cost is owned. | The licensing posture and who owns the run-cost. |
The set may grow as practice matures. A new criterion is a framework change, versioned like any other.
Your SAC baseline
Section titled “Your SAC baseline”Set this once, ratify it, and inherit it into every solution. The prompts below are questions, not answers: FitSD ships no default numbers, on purpose. Fill them with values that fit your organisation and risk appetite. (Worked example values will follow the published end-to-end example; see FitSD — Roadmap.)
Applicability. The baseline may also set applicability rules: where a criterion legitimately doesn’t apply (say, a stateless internal tool with nothing of its own to back up). At acceptance, such a criterion is recorded N/A per baseline, with the reason, a deliberate call against a standing rule, not a skip. If you find yourself writing N/A with no rule to point at, the fix is to change the baseline, not to bend the record.
Decay. Some rows stay proven; others rot. Proven once is not proven forever: the baseline may set a re-verification cadence per criterion — a restore re-test rhythm for Backup, a continuity re-check on a cadence or on any staffing change for Supportability. Ask of each row: does this evidence have a shelf life?
Cite, don’t copy. Where a row’s values already live in a standing policy (patch timescales in your patch standard, say), the row may name that policy as its authority rather than restating the numbers — one source of truth, no drift at the next policy revision.
Owner = who maintains that row’s standard (the person you argue with to change it). Evidence owners are named per service, on the Service Acceptance Record.
| Criterion | Your standard (set once, ratified) | Owner |
|---|---|---|
| Documentation | Which documents are mandatory; where they live | |
| Backup (tested) | Backup scope; frequency; retention; how often a restore is tested | |
| Security | Hardening standard; patch timescales by severity; acceptable vulnerability posture | |
| Access | Access model; least-privilege rules; how often access is reviewed | |
| Availability | Availability target / SLO (by tier, if you tier); DR position | |
| Monitoring & alerting | What must be monitored; thresholds; where alerts route | |
| Incident profile | Severity scheme; what counts as a reportable incident | |
| Supportability / handover | Support model; the continuity rule (no single-person dependency); how operating-procedure changes the service requires are captured | |
| Cost / licensing | Licensing posture; who owns ongoing run-cost |
Ratification. A baseline is only standing once it’s owned.
| Field | Entry |
|---|---|
| Ratified by | (the accountable owner, e.g. Management System Owner) |
| Date | |
| Review cadence | (tie to your management-system review; FSD-GV-5) |
How the baseline flows
Section titled “How the baseline flows”- Idea Brief (FSD-FRM-00) — referenced, not re-specified: the brief names the SAC baseline as the service-quality expectation and notes any project-specific emphasis, so quality shapes selection from the start.
- Gate 2 (FSD-FRM-02 §5) — designed: how each criterion will be met against the baseline.
- Service Acceptance (FSD-FRM-03 §1) — proven: evidence each criterion meets the baseline before the service goes live.
Standing up the baseline for the first time is an explicit step in FitSD — Implementation Guide.
See also
Section titled “See also”FitSD — Requirements: the binding “shall” (the standing-baseline requirement; FSD-SD-4/5)capabilities/solution-development/FSD-PRO§7: where the criteria are proven at Service AcceptanceFitSD — Implementation Guide: how an organisation ratifies its baseline when standing FitSD upreference/FitSD — Standards Alignment: how the criteria map to ISO 27001 / NIS2 / FitSMreference/FitSD — Information Stores: the SAC baseline and the acceptance records as owned stores