TL;DR — The testable “shall” statements you must meet to conform, grouped by the five capabilities. Each is a one-line outcome; the right-hand Note says what it means in practice. Meet them with your own documents and tools — FitSD ships a full process only for Solution Development.

Status: v0.2 draft, founding layer. This is Tier 1 of FitSD — the testable spine. Each requirement is a “shall” statement that an implementation must satisfy to conform, by whatever local documents and tools it chooses (see Charter §7). Requirements are grouped by the five capabilities. IDs are stable; wording will be refined.

Each requirement has an ID (FSD-XX-n), a statement, and where useful a short note on intent. Conformance is about the requirement being met and evidenced — not about adopting any particular template. Keep the set small: a requirement that does not change a decision does not belong here.

Two registers of depth. FitSD owns only the requirements — these thin, outcome-based “shall” statements. It deliberately does not build a process for every capability. The how is satisfied one of two ways: (a) a FitSD reference capability (a Tier 2 process doc — shipped only for the flagship, Solution Development), or (b) a reference to an existing process or standard the team already runs (its own change- or incident-management policy, or ITIL / FitSM). Each capability names where its “how” lives. This is how FitSD can require change, incident, security and the rest without rebuilding those disciplines.


The management system itself.

Reference (how satisfied): met directly by your scope, document-control, roles and review practices — FitSD ships no separate process. Maps to FitSM GR1–GR9, ITIL SVS governance, ISO 27001 clauses 4–10.

IDRequirementNote
FSD-GV-1The scope of services under management shall be defined and recorded.What is in and out of the system.
FSD-GV-2Each service shall have a single named owner accountable for it.Roles may be shared; accountability is not.
FSD-GV-3Documents that govern services shall be version-controlled, each with an owner, an approver, and a review cycle.Document control.
FSD-GV-4A register of services, the demand pipeline, and key records shall be maintained and kept current, with completed and retired entries retained as the historical record.The system’s index — the upcoming, in-flight and completed view.
FSD-GV-5The management system shall be reviewed at a defined cadence and improved (Plan-Do-Check-Act).Continual improvement.
FSD-GV-6Roles shall be defined, including who may authorise what.One person may hold several.

FSD-SD — Bring in (Solution Development)

Section titled “FSD-SD — Bring in (Solution Development)”

The front door. How net-new work enters and reaches live service — and the control point for adopting new technology.

Reference (how satisfied): the one capability FitSD ships in full — FSD-PRO plus the Gate and Acceptance forms (Tier 2/4). This is the framework’s flagship; everything else references out.

IDRequirementNote
FSD-SD-1Net-new services shall enter through a defined intake before build effort is committed.A scope test separates this from routine change — including adopting a new technology, tool or third-party dependency the team must own, support or secure, regardless of cost or effort.
FSD-SD-2A new service shall pass a value/feasibility decision before design begins.Gate 1 — “worth doing?”
FSD-SD-3A new service shall pass a design-readiness decision before delivery, covering how it will be operated.Gate 2 — “ready to build?”
FSD-SD-4Every new or materially changed service shall meet a defined Service Acceptance / Definition of Done before entering live service, evidenced rather than asserted.Readiness baked in.
FSD-SD-5Service Acceptance shall, as a minimum, cover: documentation; tested backup and recoverability; security; access control; availability; monitoring and alerting; service-level incident triggers; supportability, handover and continuity (operating knowledge captured, not reliant on a single person); and cost/licensing.The Definition of Done (see FSD-PRO §7); the set may grow as practice matures. Incident triggers also satisfy FSD-RR-6.
FSD-SD-6Each gate and acceptance decision shall have a single accountable approver and be recorded.Lightweight, single-approver by default.

Changing live services safely.

Reference (how satisfied): FitSD states the requirements only and does not build a change-management process. Satisfy them with your existing change/CAB process or an external standard — ITIL 4 Change enablement, FitSM PR12.

IDRequirementNote
FSD-CH-1Changes to live services shall be assessed for risk and impact before implementation.
FSD-CH-2Changes shall be authorised by an authority appropriate to their risk.Standard/normal/major tiers.
FSD-CH-3Changes shall be recorded, and significant changes reviewed after implementation.
FSD-CH-4Releases shall be deployed in a controlled, repeatable, and where feasible reversible way.

Keeping services healthy.

Reference (how satisfied): FitSD does not build incident or problem management — most organisations run a central incident-management policy. Satisfy via that policy (or ITIL Incident / Problem / Monitoring and event, FitSM PR9/PR10/PR4). FitSD’s distinct contribution is twofold: require each service to plug into it (FSD-RR-6), and require services to be retired cleanly at end of life (FSD-RR-7).

IDRequirementNote
FSD-RR-1Service-affecting events shall be detected, recorded, prioritised and resolved against defined targets.Via the incident-management process.
FSD-RR-2Major incidents shall have a defined escalation and communication path.Usually the central incident-management policy.
FSD-RR-3Recurring or high-impact incidents shall be investigated for root cause.Problem management.
FSD-RR-4Services shall be monitored against expected availability, and capacity managed ahead of need.
FSD-RR-5Security patches shall be assessed and applied within risk-based timescales.
FSD-RR-6Each service shall declare a service-level incident profile — what constitutes an incident for that service, with triggers and severities — registered with the incident-management process.The gap most orgs have: central policy defines “an incident” generically; the per-service triggers are rarely written down. Defined at Service Acceptance (SAC), consumed by the central process.
FSD-RR-7When a service reaches end of life (EOL/EOS, obsolescence, or no longer needed), a decision shall be recorded — renew, replace, or retire — and, if retired, decommissioning shall be controlled: data handled, access revoked, SLAs withdrawn, documentation archived, the register updated, and operating knowledge captured (so another person could run or wind it down).Closes the lifecycle. Replace routes back to Solution Development as new demand; renew keeps it running (contract/licence via the planned FSD-SC); access and data disposal tie to FSD-SA.

Staying safe and compliant.

Reference (how satisfied): met by your information-security and risk practices — FitSD ships no separate process here. Maps to ISO 27001 Annex A, FitSM PR6, ITIL Information security / Risk management. (Supplier / supply-chain — FSD-SC — is on the backlog, closing NIS2 21(2)(d).)

IDRequirementNote
FSD-SA-1Risks to services shall be identified, recorded in a register, and treated or formally accepted by an accountable owner.
FSD-SA-2Access shall follow least privilege, with joiners/movers/leavers handled and access reviewed periodically.
FSD-SA-3Data shall be backed up to a defined scheme, and recoverability tested — not assumed.Ties to FSD-SD-5.
FSD-SA-4Departures from policy shall be handled as recorded, time-bound, compensated exceptions.
FSD-SA-5Service management shall align to applicable legal and regulatory obligations, with evidence of control retained.e.g. NIS2-style measures.

FitSD ships reference documents for its flagship Solution Development capability, which implementers may adopt and adapt:

  • Solution Development Process — the two-gate process plus Service Acceptance close-out (satisfies FSD-SD-1…6).
  • Gate 1 — Outline Proposal form.
  • Gate 2 — Solution Design form.
  • Service Acceptance Record — the Definition of Done (satisfies FSD-SD-5).

These are illustrative reference material, not part of the normative requirements above. An implementation conforms by meeting the requirements, however it chooses to document them.


Coverage note: FSD-GV and FSD-SD are the founding spine. FSD-CH / FSD-RR / FSD-SA are stated here so the requirement set is complete, but their reference capabilities (Tier 2) come later.