FitSD — Requirements

FitSDTier 1draft

TL;DR — The testable “shall” statements you must meet to conform, grouped by capability. Each is a one-line outcome; the right-hand Note says what it means in practice. Meet them with your own documents and tools. FitSD ships a full process only for Solution Development.

Status: draft, founding layer. This is Tier 1 of FitSD: the testable spine. Each requirement is a “shall” statement that an implementation must satisfy to conform, by whatever local documents and tools it chooses (see Charter §7). Requirements are grouped by capability. IDs are stable; wording will be refined.

Each requirement has an ID (FSD-XX-n), a statement, and where useful a short note on intent. Conformance is about the requirement being met and evidenced, not about adopting any particular template. Keep the set small: a requirement that does not change a decision does not belong here.

Two routes to the how. FitSD owns only the requirements: these thin, outcome-based “shall” statements. It deliberately does not build a process for every capability.

The how is satisfied one of two ways: (a) a FitSD reference capability (a Tier 2 process doc, shipped only for the flagship, Solution Development), or (b) a reference to an existing process or standard the team already runs (its own change- or incident-management policy, or ITIL / FitSM). Each capability names where its “how” lives. This is how FitSD can require change, incident, security and the rest without rebuilding those disciplines.


The management system itself.

Reference (how satisfied): met directly by your scope, document-control, roles and review practices. FitSD ships no separate process. Maps to FitSM GR1–GR9, ITIL SVS governance, ISO 27001 clauses 4–10.

IDRequirementNote
FSD-GV-1The scope of services under management shall be defined and recorded.What is in and out of the system.
FSD-GV-2Each service shall have a single named owner accountable for it.Roles may be shared; accountability is not.
FSD-GV-3Documents that govern services shall be version-controlled, each with an owner, an approver, and a review cycle.Document control.
FSD-GV-4A register of services, the demand pipeline, and key records shall be maintained and kept current, with completed and retired entries retained as the historical record.The system’s index: the upcoming, in-flight and completed view.
FSD-GV-5The management system shall be reviewed at a defined cadence and improved (Plan-Do-Check-Act).Continual improvement. The review looks at per-service state — register accuracy, open conditions (FSD-SD-7), overdue evidence, end-of-life candidates — not only at the system; a review missed by its due date is escalated, not skipped.
FSD-GV-6Roles shall be defined, including who may authorise what.One person may hold several.
FSD-GV-7The organisation shall define and ratify a standing Service Acceptance baseline — its own thresholds for each Service Acceptance Criterion — and apply it to every solution’s Service Acceptance.The SAC categories are fixed (FSD-SD-5); the thresholds are the organisation’s, set once and inherited by every solution rather than rediscovered each time. Defined in reference/FitSD — Service Acceptance Criteria; stood up via FitSD — Implementation Guide.
FSD-GV-8When the accountable owner of a live service changes or leaves, continuity shall be re-established and re-evidenced within a period the organisation defines: a handover, the successor’s walk-through of the runbook and recovery procedure, any deputy or cover the baseline requires re-named, and the leaver’s owned register entries transferred.The gap between “owner named” (FSD-GV-2) and “leaver’s access revoked” (FSD-SA-2) is where operating knowledge lives. Continuity is proven at Service Acceptance (FSD-SD-5); this re-proves it on the one event that voids it.
FSD-GV-9Each live service shall have agreed, recorded service levels — or an explicit best-effort statement — with its customers, published to them, and performance against them shall be reported to those customers at a defined cadence.Thin and reference-out: the availability SLO already lives in the SAC; reporting can ride the FSD-GV-5 review or another meeting you already hold. Closes the FitSM PR2/PR3 gap.

The front door. How net-new work enters and reaches live service, and the control point for adopting new technology.

Reference (how satisfied): the one capability FitSD ships in full: FSD-PRO plus the Gate and Acceptance forms (Tier 2/4). This is the framework’s flagship; everything else references out.

IDRequirementNote
FSD-SD-1Net-new services shall enter through a defined intake before build effort is committed.A scope test separates this from routine change, including adopting a new technology, tool or third-party dependency the team must own, support or secure, regardless of cost or effort.
FSD-SD-2A new service shall pass a value/feasibility decision before design begins.Gate 1: “worth doing?”
FSD-SD-3A new service shall pass a design-readiness decision before delivery, covering how it will be operated.Gate 2: “ready to build?”
FSD-SD-4Every new or materially changed service shall meet a defined Service Acceptance / Definition of Done before entering live service, evidenced rather than asserted.Readiness baked in.
FSD-SD-5Service Acceptance shall, as a minimum, cover: documentation; tested backup and recoverability; security; access control; availability; monitoring and alerting; service-level incident triggers; supportability, handover and continuity (operating knowledge captured, not reliant on a single person); and cost/licensing.The Definition of Done: categories defined in reference/FitSD — Service Acceptance Criteria, proven at FSD-PRO §7. The set may grow as practice matures; thresholds are the organisation’s standing baseline (FSD-GV-7), including any recorded applicability rules. Incident triggers also satisfy FSD-RR-6.
FSD-SD-6Each gate and acceptance decision shall have a single accountable approver and be recorded.Lightweight, single-approver by default.
FSD-SD-7Conditions attached to a gate or acceptance decision shall be recorded with an owner and a target date and tracked to closure; a breached condition shall be escalated to the approver who set it.Real decisions are usually “yes, with conditions”. The forms carry the fields (FRM-02 §1, FRM-03 §2–3); this is the duty that stops conditions silently dying after go-live. A new requirement, not a tightening of FSD-SD-6.

Changing live services safely.

Reference (how satisfied): FitSD states the requirements only and does not build a change-management process. Satisfy them with your existing change/CAB process or an external standard: ITIL 4 Change enablement, FitSM PR12.

IDRequirementNote
FSD-CH-1Changes to live services shall be assessed for risk and impact before implementation.
FSD-CH-2Changes shall be authorised by an authority appropriate to their risk.Standard/normal/major tiers.
FSD-CH-3Changes shall be recorded, and significant changes reviewed after implementation.
FSD-CH-4Releases shall be deployed in a controlled, repeatable, and where feasible reversible way.

Keeping services healthy.

Reference (how satisfied): FitSD does not build incident or problem management; most organisations run a central incident-management policy. Satisfy via that policy (or ITIL Incident / Problem / Monitoring and event, FitSM PR9/PR10/PR4). FitSD’s distinct contribution is twofold: require each service to plug into it (FSD-RR-6), and require services to be retired cleanly at end of life (FSD-RR-7).

IDRequirementNote
FSD-RR-1Service-affecting events shall be detected, recorded, prioritised and resolved against defined targets.Via the incident-management process.
FSD-RR-2Major incidents shall have a defined escalation and communication path.Usually the central incident-management policy.
FSD-RR-3Recurring or high-impact incidents shall be investigated for root cause.Problem management.
FSD-RR-4Services shall be monitored against expected availability, and capacity managed ahead of need.
FSD-RR-5Security patches shall be assessed and applied within risk-based timescales.
FSD-RR-6Each service shall declare a service-level incident profile — what constitutes an incident for that service, with triggers and severities — registered with the incident-management process.The gap most orgs have: central policy defines “an incident” generically; the per-service triggers are rarely written down. Defined at Service Acceptance (SAC), consumed by the central process. Registration is evidenced: the incident process’s owner accepts the profile, by name and date.
FSD-RR-7When a service reaches end of life (EOL/EOS, obsolescence, or no longer needed), a decision shall be recorded — renew, replace, or retire — and, if retired, decommissioning shall be controlled: data handled, access revoked, SLAs withdrawn, documentation archived, the register updated, and operating knowledge captured (so another person could run or wind it down).Closes the lifecycle. Replace routes back to Solution Development as new demand; renew keeps it running (contract/licence via FSD-SC); access and data disposal tie to FSD-SA. Recording “not retire — succession routed to Solution Development”, with renew-vs-replace settled at Gate 1, is a legitimate decision.

Staying safe and compliant.

Reference (how satisfied): met by your information-security and risk practices. FitSD ships no separate process here. Maps to ISO 27001 Annex A, FitSM PR6, ITIL Information security / Risk management. (Supplier / supply-chain duties live next door in FSD-SC.)

IDRequirementNote
FSD-SA-1Risks to services shall be identified, recorded in a register, and treated or formally accepted by an accountable owner.
FSD-SA-2Access shall follow least privilege, with joiners/movers/leavers handled and access reviewed periodically.
FSD-SA-3Data shall be backed up to a defined scheme, and recoverability tested, not assumed.Ties to FSD-SD-5.
FSD-SA-4Departures from policy shall be handled as recorded, time-bound, compensated exceptions.
FSD-SA-5Service management shall align to applicable legal and regulatory obligations, with evidence of control retained.e.g. NIS2-style measures.
FSD-SA-6Cryptographic material — keys, secrets, certificates — shall be managed to a defined standard covering generation, storage, rotation and revocation, with evidence of control retained.Reference out to your key-management practice. Closes NIS2 Article 21(2)(h); the per-service posture is designed and proven under the SAC Security criterion.

Who the services stand on. Conditional: these requirements apply where services rely on suppliers or third-party dependencies the team is accountable for: cloud, SaaS, support contracts, critical products. In practice that’s most teams; one with genuinely none records that fact and moves on.

Reference (how satisfied): met by your procurement and supplier-management practice. FitSD ships no separate process. Maps to ISO 27001 A.5.19–A.5.22, FitSM PR8, NIS2 Article 21(2)(d). The intake-side control already exists: the FSD-SD-1 new-technology trigger and Gate 1’s vendor due diligence (FSD-FRM-01 §6).

IDRequirementNote
FSD-SC-1Suppliers and third-party dependencies that live services rely on shall be recorded, each with an accountable owner.The supplier register. See FitSD — Information Stores.
FSD-SC-2A new supplier or third-party dependency shall be assessed for risk and suitability before it is adopted.Satisfied at intake: the FSD-SD-1 new-technology trigger and Gate 1 vendor due diligence.
FSD-SC-3Where a supplier handles the team’s data or supports a live service, security and service expectations shall be set in the agreement and evidence retained.Contracts, DPAs, support terms, proportionate to what the supplier touches.
FSD-SC-4Supplier dependencies shall be reviewed periodically — support horizons (EOL/EOS), renewals, performance — with an exit or replacement path understood for any a service cannot run without.Feeds the end-of-life decision (FSD-RR-7 renew): the Gate 1 “how would we get off it?” question, kept alive.

FitSD ships reference documents for its flagship Solution Development capability, which implementers may adopt and adapt:

  • Idea Brief form: the pre-Gate-1 intake (FSD-FRM-00).
  • Solution Development Process: the two-gate process plus Service Acceptance close-out (satisfies FSD-SD-1…7).
  • Gate 1 — Outline Proposal form.
  • Gate 2 — Solution Design form.
  • Service Acceptance Record: the Definition of Done (satisfies FSD-SD-4/5).
  • Service Acceptance Criteria (reference/): where the SAC categories are defined and an organisation ratifies its standing baseline (supports FSD-GV-7).

These are illustrative reference material, not part of the normative requirements above. An implementation conforms by meeting the requirements, however it chooses to document them.


Coverage note: FSD-GV and FSD-SD are the founding spine. FSD-CH / FSD-RR / FSD-SA / FSD-SC are stated here so the requirement set is complete; their Tier 2 treatment is a capability card plus the process you already run. Deliberately. FitSD builds no second full process (see the Roadmap, “Shape & scope”).