The fastest path from “what’s this?” to “we’re using it.” Written for one person on a small team who wants a win this week — not a rollout plan.

You don’t adopt FitSD by reading it. You adopt it by running one real piece of work through the front door and seeing whether it helps. Here’s the whole thing in five moves.

The shape, in one line: FitSD uses two gatesis this worth doing? (Gate 1) and is it ready to build? (Gate 2) — then a final Service Acceptance check that it’s proven ready to run.

  • Pick one real piece of upcoming work — something net-new (a new service, tool, or capability — not a routine change to something you already run). A tool to stand up, a service to replace, a capability to add.
  • Grab the three forms from capabilities/solution-development/: Gate 1 (Outline Proposal), Gate 2 (Solution Design), and the Service Acceptance Record.

1. Write the Idea Brief — half a day, tops

Section titled “1. Write the Idea Brief — half a day, tops”

One page. What’s the problem, what would “done” look like, what’s roughly in and out of scope. Don’t design anything yet; you’re just getting enough on paper to decide whether it’s worth a proper look. (A public worked example, run end to end, is in the works.)

2. Take it to Gate 1 — one short conversation

Section titled “2. Take it to Gate 1 — one short conversation”

Fill the Gate 1 form: the driver, a rough value/risk read, T-shirt effort, the options you can see, and the decision you’re asking for. Put it in front of whoever says yes or no. They proceed, park, or reject. That decision — made on a page instead of in a corridor — is the first thing FitSD buys you.

3. Design it at Gate 2 — once Gate 1 says go

Section titled “3. Design it at Gate 2 — once Gate 1 says go”

Now you design. Requirements, an architecture sketch with security in it, and the bit teams skip: how each acceptance criterion will actually be met — documentation, tested backup, access, monitoring, support, cost. If you can’t yet say how you’ll back it up or who’ll support it, you’ve found the problem now instead of in six months.

4. Build it — through your normal change process

Section titled “4. Build it — through your normal change process”

FitSD hands the build back to however you already ship. It doesn’t replace your change process; it just made sure you knew what you were building, and why.

5. Accept it into service — the close-out that matters

Section titled “5. Accept it into service — the close-out that matters”

Before you call it live, walk the Service Acceptance Record. Each criterion: met, with evidence? A tested restore, not a configured one. An alert that actually fired. A runbook someone other than you could follow. When it passes, it’s a product with an owner — not a thing you’ll quietly carry alone forever.

You’ve run one service through the front door. If it helped — the Gate 1 conversation went better, or the acceptance check caught something — do it again with the next piece of work. That’s adoption: one project at a time, never a big bang.

Next: the maturity self-check (once built) will tell you where you stand and what one notch better looks like. Until then, the five capability cards in capabilities/ show what else FitSD covers and what to point at for each.