Skip to content

FSD-RR — Run & Restore

FitSDTier 2draft

Capability card. Keep live services healthy, and get them back fast when they break.

What a capability card is. A one-page orientation, not a process: what the capability is for, the requirements it carries, what to satisfy them with, and how it wires into Solution Development. FitSD authors a full process only for Solution Development; the rest are requirements plus a pointer.

Detect when something’s wrong, fix it fast, and stop it happening twice. This is the day-to-day reality of running services: incidents, the occasional bad day that becomes a major incident, the recurring faults worth chasing to root cause, and the monitoring and patching that keep the lights on.

In: incidents and major incidents, problems, monitoring and availability, capacity, patching, each service’s incident profile, and end-of-life review & retirement. Out: building new services (Solution Development) and changing them (Change & Release).

  • FSD-RR-1: service-affecting events detected, recorded, prioritised and resolved to targets.
  • FSD-RR-2: major incidents have a defined escalation and communication path.
  • FSD-RR-3: recurring or high-impact incidents investigated for root cause.
  • FSD-RR-4: services monitored against expected availability; capacity managed ahead of need.
  • FSD-RR-5: security patches assessed and applied to risk-based timescales.
  • FSD-RR-6: each service declares its incident profile (what counts as an incident for it, with severities), registered with the incident process.
  • FSD-RR-7: at end of life, a renew / replace / retire decision is recorded; retirement is carried out cleanly (data, access, SLAs, docs, register, knowledge).

Most teams already run a central incident policy. Use it. Map onto:

  • FitSM PR9 (Incident & Service Request), PR10 (Problem), PR4 (Availability & Continuity), PR5 (Capacity).
  • ITIL 4 Incident, Problem, and Monitoring & Event management.
  • Your central incident-management policy for the escalation and comms path.
  • No central policy or severity scheme at all? Define Sev1–4 in your SAC baseline and treat it as the team’s standing scheme — the per-service profiles then have something to register against.

FitSD’s distinct contributions here are two. FSD-RR-6 — the per-service incident profile: central policies define “an incident” in the abstract; almost nobody writes down what it means for this service (FitSD makes you, at Service Acceptance). And FSD-RR-7 — controlled end-of-life: most teams have no clean way to retire a service, so they never quite do; FitSD makes the renew / replace / retire decision explicit and the decommission controlled.

The Service Acceptance criteria are the hand-over. Monitoring & alerting, the incident profile, and the supportability / handover all pass from a new service into Run & Restore the moment it’s accepted. And the loop closes at end of life (FSD-RR-7): a service is reviewed and either renewed (keep running), replaced (the function’s still needed, back through the front door as fresh demand) or retired (decommissioned cleanly). What you learn running a service (a nasty incident, a capacity ceiling) also comes back round as new demand.

This is the Second Way of The Phoenix Project: fast feedback, right to left. See problems as they happen, restore quickly, and feed what you learn back upstream. The metric is time to restore service (one of the DORA four), and the cultural habit is the blameless postmortem, which is really just problem management (FSD-RR-3) done without finger-pointing.

  • 0–1: incidents handled by whoever’s nearest; little record, no root-cause habit.
  • 2–3: defined incident and problem paths, monitoring in place, patches kept up.
  • 4–5: MTTR watched and falling; recurring problems designed out, not just fixed.

(Full 0–5 scale in the Charter, §7.)

  • FSD-PRO: Solution Development (hands over monitoring, incident profile and support model)
  • FitSD — Requirements → FSD-RR section
  • FitSD — Standards Alignment: FitSM PR9/PR10/PR4, ITIL mapping
  • reference/FitSD — Influences: the canon behind the feedback lens