Skip to content

Stage 5, product manager

AI simulationv0.3Fernbrook Software2026-08

Perspective: asked to take long-term product ownership of a live FitSD-delivered service — roadmap, a backlog of feature requests from eight consuming teams, adoption targets, prioritisation of enhancements. Read the standard specifically for what it offers that seat.

[S5-PM-1] No role is accountable for a service’s value over time

  • Kind: gap
  • What I needed: a role I could take (or map to) that owns roadmap, prioritisation and value-over-time for a live service — distinct from operational accountability.
  • What the standard gave me: Charter §6 names five roles (Management System Owner, Service Owner, Approver, Operator, Consulted SME). The Service Owner is “accountable, end-to-end, for a given service” — read throughout as operational accountability (register entry, continuity, run-cost). “Product” appears only incidentally (FSD-PRO §1 “new service, product, or platform capability”; §7 “the product itself”). The Tier 3 roles model that might settle whether value accountability exists is explicitly unbuilt (Roadmap, “Then — the unbuilt tiers”; BACKLOG). No register or record names a product owner; the service register’s fields (FSD-GV-2/4, Information Stores) have no place for one.
  • What I did about it: in character, made acceptance conditional on a locally invented role definition (a one-page adoption-pack addition, a service-register column), keeping Service Owner accountability untouched.
  • Severity: major
  • FitSD doc & section: Charter §6; FSD-PRO §3; FitSD — Roadmap (“Tier 3 — Roles model”)
  • Suggested fix: when Tier 3 lands, either add an optional Product/Value Owner role or state explicitly that the Service Owner carries value accountability — silence is read as “nobody does”.

[S5-PM-2] Minor enhancements route to FSD-CH, but no backlog store exists and nobody ranks it

  • Kind: gap
  • What I needed: where eight teams’ feature requests wait, and who prioritises them.
  • What the standard gave me: FSD-PRO §1 splits demand cleanly: net-new goes through the front door (Idea Brief → Gate 1); “routine changes and minor enhancements are handled under the Change & Release capability (FSD-CH)”. But FSD-CH is purely a risk-control capability (FSD-CH-1…4: assess, authorise, record, deploy) — it has no queue, no value test, no prioritisation mechanism. Information Stores names a demand/pipeline register for the front door and change records for changes already decided; a pending below-the-line enhancement has no named home. Of the three real requests in the simulation, two (SSH cert support, Terraform provider) trip FSD-PRO §1 triggers and become individual Gate 1 cases; the third (CT reporting) falls into FSD-CH and simply has nowhere to sit.
  • What I did about it: invented a local “enhancement backlog” lane beside the demand register, with the (invented) product owner triaging items against the FSD-PRO §1 line.
  • Severity: major
  • FitSD doc & section: FSD-PRO §1 (Out of scope); FSD-CH (Requirements it carries); reference/FitSD — Information Stores (catalogue)
  • Suggested fix: one line in Information Stores — a below-the-line enhancement queue (or an explicit statement that the demand register may hold sub-gate items), with a named prioritiser.

[S5-PM-3] Prioritisation across the portfolio is implied but never assigned

  • Kind: ambiguity
  • What I needed: who ranks competing demand — across net-new cases, and between net-new and enhancements, when the delivering team is the constraint.
  • What the standard gave me: FRM-01 §2 says to score the value lenses “anyway, for prioritisation” — so the standard expects ranking — but no role, forum or mechanism ever performs it. MoSCoW (Gate 2) prioritises requirements within one solution. The Approver decides go/park/reject per item, which is sequencing by side effect. The FSD-CH card’s flow lens (gates as a WIP limit, Theory of Constraints) shows the author knows the constraint problem; the ranking half is missing.
  • What I did about it: local call — product owner ranks, Approver still decides at gates; monthly ops review (an adoption-pack invention) is the venue.
  • Severity: major
  • FitSD doc & section: FSD-FRM-01 §2; FSD-PRO §5; FSD-CH (“The flow lens”)
  • Suggested fix: a sentence in FSD-PRO or the Govern card naming who orders the pipeline (even “the Approver, at the review cadence” would do).

[S5-PM-4] Nothing measures adoption or satisfaction — and the standard knows

  • Kind: gap
  • What I needed: an instrument for whether the service is being adopted and whether its customers are satisfied — the basis of any adoption target or investment case.
  • What the standard gave me: an honest confession. Standards Alignment §2 names FitSM PR3 Service Reporting as a known gap (“candidate thin requirement”, see BACKLOG) and PR7 Customer Relationship Management as a declared non-goal. What exists measures other things: DORA metrics are flow, the SAC availability SLO is uptime. In the simulation, the migration-progress reporting was a Gate 2 approver condition — invented per-project, exactly what a standing requirement would have made unnecessary.
  • What I did about it: in character, made a monthly service report (adoption, tickets, satisfaction pulse) a condition of acceptance of the role.
  • Severity: major
  • FitSD doc & section: reference/FitSD — Standards Alignment §2; BACKLOG (“Service Reporting (candidate thin requirement)”)
  • Suggested fix: promote the backlogged thin shall — “service performance is reported to stakeholders at a defined cadence” — folded into the FSD-GV-5 review, as the backlog itself proposes. Cheap, and it is the row a PM (and FitSM assessor) looks for first.

[S5-PM-5] The EOL loop is real lifecycle thinking, but only fires at the deathbed

  • Kind: friction
  • What I needed: a point in the live phase where “should we invest more in this?” is asked — the grow/extend arm of a product lifecycle.
  • What the standard gave me: FSD-RR-7’s renew/replace/retire decision is genuine product-lifecycle machinery — replace routing back through the front door as new demand is a loop a PM recognises and approves of. But it triggers “when a service reaches end of life”, and the FSD-GV-5 review is described as catching drift and surfacing EOL candidates (Govern card). Between acceptance and EOL the standard’s stance is BAU. The model is internally coherent — new investment simply is new demand through the front door — but nobody is tasked with generating that demand for a live service, which compounds S5-PM-1.
  • What I did about it: in character, asked for a product line (adoption, demand, investment case) in the annual review alongside the RR-7-feeding supplier-health check.
  • Severity: minor
  • FitSD doc & section: FSD-RR (“Where it meets Solution Development”, FSD-RR-7); FSD-GV (“Where it meets Solution Development”); FitSD — Definitions (“End-of-life review”)
  • Suggested fix: one clause in the FSD-GV-5 or RR-7 note: the periodic review also asks whether a live service warrants further investment, routed as new demand.

[S5-PM-6] The Gate 1 form is a better business case than most product organisations use

  • Kind: worked-well
  • What I needed: a fundable case format for the two feature requests that trip the net-new line.
  • What the standard gave me: FRM-01 in full: primary driver (value/compliance/risk) with the explicit rule that low value scores don’t weaken a mandated case; four plain value lenses; impact of doing nothing; why now; and a case-expiry date (“When does this expire?”) — decay discipline most PM shops lack. Definitions states flatly that the Gate 1 record is the business case, “in the language leadership funds work in”. Gate 2’s MoSCoW-rated user stories are native PM practice already in the template. From this seat, the Solution Development spine is immediately reusable as roadmap machinery, one item at a time.
  • What I did about it: nothing needed — praised it in the memo and adopted it as the vehicle for above-the-line roadmap items.
  • Severity: praise
  • FitSD doc & section: FSD-FRM-01 §2–§5; FitSD — Definitions (“Business case”)
  • Suggested fix: —

[S5-PM-7] The front door protects a roadmap owner from side-channel scope creep

  • Kind: worked-well
  • What I needed: confidence that eight consuming teams can’t route around whoever prioritises.
  • What the standard gave me: FSD-PRO §1 makes demand source-agnostic (anyone may raise it, all through the same door), the net-new triggers catch material requests regardless of who asks or how small the tech seems, and FSD-GV-4 retains parked and rejected demand with reasons — an institutional memory of “no” that most organisations lose. The anti-sprawl trigger doubles as an anti-scope-creep control: a “small” Terraform provider cannot slip in as a routine change. A PM inherits this protection for free.
  • What I did about it: nothing needed — leaned on it in the memo.
  • Severity: praise
  • FitSD doc & section: FSD-PRO §1 (“In scope”, “Who may raise demand”); FSD-GV-4; reference/FitSD — Information Stores (“Demand / pipeline register”)
  • Suggested fix: —

Summary judgement (out of character). “Product” does not exist in FitSD as a thing with a future: the unit is the service (provided, run, supported — Charter §8), and its forward arc is acceptance → BAU → renew/replace/retire. That is a defensible scope choice for an ops-facing standard, and the front door plus FRM-01 give a PM better per-item machinery than most product stacks. But the connective tissue a PM needs — a value-owner role, a home for the sub-gate backlog, a prioritiser, and any measure of adoption — must all be invented locally. Three of the four are already acknowledged in the standard’s own Roadmap/BACKLOG (Tier 3 roles, service reporting), which is to its credit; the enhancement backlog (S5-PM-2) appears genuinely unnoticed and is the cheapest to fix.