Stage 2b, Approver perspective

AI simulationv0.3Fernbrook Software2026-08

Reviewer’s notes, out of character. Context: acting as the Gate 1 Approver on S2-FRM-01 (CertHub), reading the standard as a team manager would — what am I signing, is it my call, and what does it cost my team. Decision reached: proceed via PoC first, with conditions (see the artifact §8).

[S2b-MANAGER-1] Signing Gate 1 — accountable for what, exactly?

  • Kind: gap
  • What I needed: what my signature commits me to. Design effort? The PoC’s five person-days? Later build budget? The risk of the eventual service? When Dana asks “why did you approve this?”, what am I answerable for?
  • What the standard gave me: FSD-PRO §2/§3 — the Approver “reviews and signs off… at a level appropriate to the risk”; FSD-FRM-01 §8 — “Sign-off authorises progression to Gate 2 (or to a PoC first)”. That is the whole account of what approval means. Only the non-normative Adoption & Positioning (“leadership steers by approving… at Gate 1, and funds the build at Gate 2”) implies Gate 1 commits no build money.
  • What I did about it: took the position that my signature commits gate-to-gate effort only (the PoC time-box and the work of producing a Gate 2 design) and wrote that boundary into the conditions myself.
  • Severity: major
  • FitSD doc & section: FSD-PRO §5, §8; FSD-FRM-01 §8
  • Suggested fix: one sentence in FSD-PRO §5: a Gate 1 approval commits design/PoC effort only; build and run costs are committed at Gate 2.

[S2b-MANAGER-2] “At a level appropriate to the risk” — risk of the decision, or of the solution?

  • Kind: ambiguity
  • What I needed: to know whether approval routing is judged on what this gate commits (a £0, five-day PoC) or on the eventual solution (a Tier 1 service holding every private key in the estate). Priya expressly flagged the key-material / data-classification line “for the Approver” — the flag reached me; nothing told me how to rule on it.
  • What the standard gave me: FSD-PRO §2 and FSD-SD-6: single accountable approver, “at a level appropriate to the risk” — risk of what left open. Our adoption pack’s tiers (£10k line, new data classification, company-wide impact) are entirely local invention, and even they don’t say which gate a solution-level trigger bites at.
  • What I did about it: ruled on what the gate commits: the PoC touches no production key material, so Gate 1 stayed mine, and the classification question was passed to the Gate 2 design — which routes to Dana in all cases under our pack. Note honestly: the layered scheme saved me here by accident of our own design (Dana takes every Gate 2), not because the standard resolved the question.
  • Severity: major
  • FitSD doc & section: FSD-PRO §2 (Approver definition); FitSD — Requirements FSD-SD-6
  • Suggested fix: state that gate authority is judged on what the gate commits, with escalation where the solution’s risk profile outgrows the gate approver.

[S2b-MANAGER-3] No concept of sponsorship

  • Kind: gap
  • What I needed: recognition that approving Gate 1 makes me the proposal’s advocate at Gate 2. I now carry Priya’s case upward to Dana; my credibility is attached to it; I spent managerial capital before Gate 2 exists (holding two product teams off their home-builds, forcing a stopgap change). What is the mid-tier approver accountable for between the gates?
  • What the standard gave me: FSD-PRO §5 calls the record “the fundable proposal taken upward for a decision”, and Adoption & Positioning is substantially about “talking upward” — so the standard knows the record travels up. But grep finds zero occurrences of “sponsor” anywhere in keystone, and the role model (FSD-PRO §3) is Solution Owner / Approver / Contributor only. The relationship between a lower-gate approver and a higher-gate approver is nowhere.
  • What I did about it: acted as sponsor anyway — conditions 3–4 on the artifact are sponsorship acts no FitSD role asked of me.
  • Severity: major
  • FitSD doc & section: FSD-PRO §3; FitSD — Framework Charter §6 (role table)
  • Suggested fix: a line in FSD-PRO (or the planned Tier 3 role model): where approval is tiered, the earlier gate’s approver sponsors the record at the later gate.

[S2b-MANAGER-4] Gate 1 is a per-item decision; nothing pointed me at the portfolio

  • Kind: gap
  • What I needed: to weigh CertHub against everything else on a five-person team’s plate — the demand register, in-flight work, what a “yes” displaces this quarter. “Worth doing?” is the wrong question on its own; mine is “worth doing ahead of what?”.
  • What the standard gave me: the demand/pipeline register exists (FSD-GV-4; Information Stores even calls it “the view that turns a pile of gate records into a portfolio”, and Adoption & Positioning sells that view to the board) — but neither FSD-PRO §5 nor FSD-FRM-01 tells the Approver to consult it before deciding, and the form has no capacity or displacement field anywhere.
  • What I did about it: checked the PLAT front-door board before signing — but out of habit from our monthly ops review, not because the process sent me there.
  • Severity: major
  • FitSD doc & section: FSD-PRO §5; FSD-FRM-01; reference/FitSD — Information Stores
  • Suggested fix: one Approver step in FSD-PRO §5 — “decide with the demand register open” — or a “what this displaces” prompt on the form.

[S2b-MANAGER-5] Risk-driven case with a live deadline, no interim-mitigation prompt

  • Kind: gap
  • What I needed: the form to ask what contains the cited risk while we gate, PoC, design and build. The orphaned wildcard expires 2026-11-30 whether or not CertHub lands; unmitigated, the project plan quietly becomes the only barrier to a repeat of the trigger incident.
  • What the standard gave me: FSD-FRM-01 §4 asks impact-of-doing-nothing and case expiry — pressure to act, nothing on interim containment. Risk treatment exists in FSD-SA-1, but nothing ties it back to a Gate 1 record with a ticking clock.
  • What I did about it: conditioned a stopgap manual renewal via the change process, independent of the proposal’s fate.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 §4; FitSD — Requirements FSD-SA-1
  • Suggested fix: a §4 prompt: “if risk-driven — what holds the line while this is decided and delivered?”

[S2b-MANAGER-6] Header Status can’t say what §8 decided

  • Kind: friction
  • What I needed: a Status value for my actual outcome.
  • What the standard gave me: the FSD-FRM-01 header offers Draft / Submitted / Approved; §8 offers four outcomes. “Proceed via PoC first”, “Park” and “Reject” have no header representation at all.
  • What I did about it: wrote “Approved — proceed via PoC first (see §8)”.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 Header vs §8
  • Suggested fix: align the Status enumeration with the §8 outcomes.

[S2b-MANAGER-7] §8 Conditions is the junk drawer for everything the approver actually settles

  • Kind: friction
  • What I needed: somewhere to record the things a real sign-off settles beyond the decision itself: confirming the Solution Owner (the header said “for confirmation at sign-off” — the submitter’s invention, but a reasonable one), the routing rationale (why this was my call and not Dana’s), and actions I took on the back of the decision.
  • What the standard gave me: §8 is Decision / Approver / Conditions / Date. Everything else went into Conditions as free text, where the next reader must excavate it.
  • What I did about it: numbered the conditions and prefixed the routing note into the Approver cell — workable, ugly.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 §8
  • Suggested fix: an “Approver’s notes / routing” row in §8, or a prompt that the sign-off confirms the Solution Owner.

[S2b-MANAGER-8] The four Gate 1 outcomes fit the real decision exactly

  • Kind: worked-well
  • What I needed: an honest middle path — the case is strong but the core technical choice is unproven, and I did not want to fund design on an unproven stack or kill a good case.
  • What the standard gave me: FSD-PRO §5 makes “Proceed via PoC first” a first-class outcome, and “Park: revisit by a stated date” a legitimate alternative to a soft no. My genuine managerial position had a name and a box; I never had to bend the process.
  • What I did about it: used it as written.
  • Severity: praise
  • FitSD doc & section: FSD-PRO §5
  • Suggested fix: —

[S2b-MANAGER-9] The §7 PoC block let me sign a bounded experiment, not a blank cheque

  • Kind: worked-well
  • What I needed: to authorise investigation without authorising drift.
  • What the standard gave me: because FSD-FRM-01 §7 demands objective, success criteria, method/cost and duration before approval, what I signed was a five-day, £0 box with a defined deliverable (the comparison scorecard) — the form structure did the bounding for me, and the result field visibly belongs to the delivery side, not the approver.
  • What I did about it: approved it as scoped, adding only a hard-stop condition.
  • Severity: praise
  • FitSD doc & section: FSD-FRM-01 §7; FSD-PRO §2 (PoC definition: “time-boxed, low-cost, genuine feasibility uncertainty”)
  • Suggested fix: —

[S2b-MANAGER-10] The §2 driver rule protected a risk case from its own value scores

  • Kind: worked-well
  • What I needed: not to have a Growth score of 1 used (by me, or by Dana later) against a risk-reduction case with a customer-facing outage behind it.
  • What the standard gave me: FSD-FRM-01 §2’s explicit rule — for risk/compliance work the case rests on §4 and the cited record, “low scores do not weaken a mandated case” — while keeping the scores for prioritisation. Precisely the mis-read it pre-empts is the one a funding conversation would otherwise have.
  • What I did about it: leaned on it in my recorded reason.
  • Severity: praise
  • FitSD doc & section: FSD-FRM-01 §2; FSD-PRO §5
  • Suggested fix: —

[S2b-MANAGER-11] §6 due diligence and the anti-sprawl trigger surfaced the free-tier trade before commitment

  • Kind: worked-well
  • What I needed: as the manager who will own the run-cost and the supplier risk, to see the dependencies before anything is adopted — including the free ones, which are the ones that normally slip in.
  • What the standard gave me: the FSD-PRO §1 trigger (“regardless of cost or effort”) plus FRM-01 §6 dragged Let’s Encrypt into the light as a deliberate, recorded, no-SLA dependency, put smallstep’s commercial health on the PoC scorecard, and made exit paths a stated field. The £/day anchoring against our £10k routing line came from our adoption pack, not the standard — but the form gave it a place to land.
  • What I did about it: nothing needed — this is the standard doing its job at the gate where it is cheapest.
  • Severity: praise
  • FitSD doc & section: FSD-PRO §1; FSD-FRM-01 §6; FitSD — Requirements FSD-SC-2
  • Suggested fix: —