AI simulationv0.3Fernbrook Software2026-08

Fernbrook Software — internal. Confluence space: PLAT → Governance.

StatusRatified
Date of stand-up workshop2026-06-05 (half day, Meeting Room 2)
PresentMarcus Webb (Platform team manager — Management System Owner), Dana Okafor (CTO — ratifies). Consulted during the afternoon: Owen Gallagher (service delivery — support model rows), Elena Vasquez (architecture/security rows), Priya Chandra (engineer view).
Framework adoptedFitSD v0.3 (CC BY 4.0, T. Findley) — Solution Development process and forms adopted as-is; other capabilities mapped to existing Fernbrook policy (§5)
Document ownerMarcus Webb
ApproverDana Okafor
Review cycleAnnually at the June management-system review (§7), or on material change

This page records the seven stand-up decisions from FitSD — Implementation Guide, in order. It is the top of our document register (§6) and the home of our ratified SAC baseline (§4).


1. Scope (FSD-GV-1)

All shared services run by the Platform & Infrastructure team for Fernbrook’s product teams — currently CI/CD, the Kubernetes clusters, observability, DNS, and the artefact registry — plus any net-new shared service we take on. Out of scope: product-team application code, corporate IT (laptops, email, HR systems), and anything a product team runs for itself.

2. Owners and Approver (FSD-GV-2, FSD-GV-6, FSD-SD-6)

Role (FitSD)WhoNotes
Management System OwnerMarcus WebbOwns this pack, the document set and the review cycle
Service OwnerOne named engineer per live service — recorded in the Platform Service Register (§6). Assignment completed 2026-06-12; Priya Chandra owns CI/CD and observability.Accountability is per service and is not shared
ApproverMarcus Webb (default); Dana Okafor above the risk line (below)Single accountable approver per gate/acceptance
OperatorPlatform engineers; Rafi Osman (service desk, tier 1/2 front line)
Consulted SMEElena Vasquez (architecture, security); Owen Gallagher (service delivery, support model)

Who approves what, by risk. FitSD asks that the Approver acts “at a level appropriate to the risk” but leaves the levels to us, so we set the line as follows:

  • Marcus Webb approves Gate 1, Gate 2 and Service Acceptance for work within the Platform budget and affecting Platform-run services only.
  • Dana Okafor approves Gate 2 in all cases (Gate 2 commits real build effort and spend), and any gate or acceptance where annual spend exceeds £10k, a new data classification is handled, or the change has company-wide user impact.
  • Builder rule (per the Implementation Guide, “one line uncrossed”): whoever built a solution is never its sole acceptance approver. Where Marcus is the Solution Owner or has done the build, Service Acceptance approval passes to Dana, informed by Owen as the operator-side reviewer.

3. The four forms and the net-new line (FSD-SD-1…4)

The four FitSD forms are adopted unmodified as Confluence templates in the PLAT space (template gallery → “Front door”), each raised from a Jira intake ticket (§6):

  • FSD-FRM-00 — Idea Brief (optional one-pager, pre-Gate 1)
  • FSD-FRM-01 — Gate 1 Outline Proposal
  • FSD-FRM-02 — Gate 2 Solution Design
  • FSD-FRM-03 — Service Acceptance Record

Net-new effort line: 5 person-days. FitSD suggests ~10 as a default; we have halved it because on a 5-person team a person-week is already a material commitment, and our consumers are eight product teams — anything that big deserves a Gate 1 conversation. The other FSD-PRO §1 triggers (new service, new infrastructure, new ongoing burden, and any new technology or third-party dependency regardless of size) apply as written.

4. Ratified SAC baseline (FSD-GV-7)

Our standing Service Acceptance thresholds. Every solution is designed to this bar at Gate 2 and proven against it at Service Acceptance (FSD-FRM-03). Where a row cites an existing Fernbrook policy, that policy is the source of truth and this row inherits it.

Service tiers (used by several rows): Tier 1 — shared services product teams depend on to ship or run (CI/CD, Kubernetes, DNS, artefact registry, observability). Tier 2 — internal conveniences and tools used mainly by the Platform team itself.

CriterionFernbrook Platform standard (set once, ratified)Owner
DocumentationMandatory set per service: HLD, runbook (including the incident profile), recovery procedure, SOPs for routine operations, and a user/how-to page for product teams. All live in Confluence PLAT → Service Docs, linked from the service’s register entry. No document, no acceptance.Marcus Webb
Backup (tested)All service-held state backed up nightly (Velero → S3, separate AWS account, separate region). Retention: 35 nightly + 12 monthly. A dated test restore at acceptance, then every 6 months (Tier 1) / annually (Tier 2), logged in the Restore Test Log with evidence.Service Owner (per service); log owned by Marcus Webb
SecurityHardened to Fernbrook Information Security Baseline SEC-01 (CIS-aligned). Patch timescales per SEC-04: critical 7 calendar days (72 h if internet-facing or actively exploited), high 30 days, medium 90 days, low at next maintenance window. Acceptance bar: image/dependency scan in pipeline, no known critical vulnerabilities outstanding. Departures only as SEC-01 exceptions: time-bound (≤ 90 days) with a named compensating control.Elena Vasquez
AccessSSO via Okta; access granted to role groups, never individuals; least privilege. Admin access restricted to the Platform team; break-glass credentials vaulted under dual control. JML: leaver access revoked within 1 working day (same day for privileged). Reviews: privileged quarterly, standard 6-monthly (per SEC-02).Marcus Webb
AvailabilityTier 1: 99.5% monthly, measured 24×7. Tier 2: 99.0%, measured business hours. DR position: rebuild from code + restore from backup; Tier 1 RTO 4 working hours / RPO 24 h; Tier 2 RTO next business day / RPO 24 h. No active-active expectation at our size.Marcus Webb
Monitoring & alertingEvery service exports health and golden signals to Prometheus/Grafana; expiry-style dates (certificates, licences, domains) always monitored. Alert routing: Sev1/2 → Opsgenie Platform rota; Sev3/4 → #platform-alerts. At acceptance a test alert must be observed end to end.Service Owner (per service)
Incident profileSeverity scheme per IM-02: Sev1 — service down/unusable for 2+ product teams, or data-loss risk; Sev2 — down or degraded for one team, no workaround; Sev3 — degraded, workaround exists; Sev4 — minor/cosmetic. Reportable bar: Sev1–2. Each service defines its own triggers mapped to these severities in its runbook and registers them with the service desk at acceptance.Owen Gallagher
Supportability / handoverSupport model: service desk (Jira Service Management) 09:00–17:30 UK, Mon–Fri; Rafi Osman tier 1/2; Opsgenie on-call rota for Sev1 on Tier 1 services out of hours. Response: Sev1 15 min, Sev2 4 working hours, Sev3 next business day. Continuity rule: every live service has a named primary and deputy, and the deputy has completed a dated runbook walk-through before acceptance. A leaver triggers reassignment within 10 working days. Any new/changed standing procedure the service forces (Gate 2 §4) is written into the SOP set before acceptance.Owen Gallagher
Cost / licensingAll licences and paid dependencies procured via FIN-03 before go-live and recorded in the Supplier & Dependency Register with renewal date and owner. Run-cost lands on the Platform cost centre, owned by Marcus Webb, reviewed at annual budget. No personal accounts; no free tier goes load-bearing without a register entry.Marcus Webb

Applicability rules (a criterion is only ever N/A against one of these, recorded on FRM-03 with the reason):

  1. Backup (tested) — N/A where a service holds no state of its own and its full configuration is in Git (the repository’s backup regime then stands as the evidence).
  2. Availability — services consumed only by the Platform team itself default to Tier 2 unless the Approver rules otherwise.
  3. Cost / licensing — for pure OSS with no commercial agreement, “licences in place” is evidenced by the licence type recorded in the Supplier & Dependency Register; the register entry itself is never waived.

Ratification

FieldEntry
Ratified byDana Okafor, CTO (proposed by Marcus Webb, Management System Owner)
Date2026-06-05
Review cadenceAnnually at the June management-system review (§7), or on material change to policy, regulation or the service portfolio

5. Implementation profile (FSD-CH / RR / SA / SC pointed at what we already run)

CapabilityRequirementsSatisfied byOwner
GovernFSD-GV-1…7This pack (§1, §2, §7); the PLAT document register (§6); the ratified SAC baseline (§4)Marcus Webb
Solution DevelopmentFSD-SD-1…6FitSD FSD-PRO v0.3 + forms FRM-00…03, adopted unmodified; Jira PLAT intake (§6)Marcus Webb
Change & ReleaseFSD-CH-1…4Fernbrook Change Standard CH-01: weekly CAB (Wed 10:00), pre-approved standard changes, GitOps pipeline for cluster/config changes; change records in Jira CHANGEMarcus Webb
Run & RestoreFSD-RR-1…7Fernbrook Incident Management Policy IM-02 (Sev1–4, Opsgenie rota, major-incident comms path); Prometheus/Grafana/Alertmanager stack; Patch & Vulnerability Standard SEC-04; end-of-life decisions recorded in the service register (new habit from FitSD)Owen Gallagher (IM-02); Marcus Webb (RR-4/5/7)
Secure & AssureFSD-SA-1…5Fernbrook Information Security Baseline SEC-01 (CIS-aligned, incl. exceptions log); Access Control Standard SEC-02 (Okta SSO, JML, access reviews); Backup Standard SEC-03 (Velero/S3 scheme); Platform risk register (§6)Elena Vasquez (SEC-01); Marcus Webb (risk register)
Supplier & Supply Chain (applies — we run on AWS, GitHub, Okta, Atlassian, Grafana Cloud and sundry OSS)FSD-SC-1…4Procurement & Vendor Assessment Checklist FIN-03 at intake (via Gate 1 §6 vendor due diligence); Supplier & Dependency Register (§6) reviewed at the June reviewOwen Gallagher

Gaps noted at the workshop: IM-02 predates per-service incident profiles (FSD-RR-6) — closed by §4’s incident-profile row; nothing at Fernbrook previously required a tested restore (FSD-SA-3) — closed by §4’s backup row; no end-of-life discipline existed (FSD-RR-7) — the service register gains a renew/replace/retire column.

6. Registers (FSD-GV-4)

Named homes, per FitSD — Information Stores. Tools: Confluence (PLAT space) + Jira.

StoreHomeOwner
Demand / pipeline registerJira project PLAT, “Front door” board (Idea → Gate 1 → PoC → Gate 2 → Delivery → Acceptance; Parked / Rejected kept, with reasons)Marcus Webb
Gate & acceptance recordsConfluence PLAT → Solution Development, one page per record (from the §3 templates), linked from the Jira ticketSolution Owner per item
Service register / catalogueConfluence: Platform Service Register (service, owner, deputy, tier, status incl. retired, EOL decision)Marcus Webb
SAC baseline (standing)§4 of this pageMarcus Webb
Document registerConfluence: PLAT Governing Documents (owner, approver, review date per doc; this pack is row 1)Marcus Webb
Risk registerConfluence: Platform Risk Register (risk, owner, treat/accept, review date)Marcus Webb
Supplier / dependency registerConfluence: Supplier & Dependency Register (supplier/dependency, owner, agreement, renewal, support horizon, exit note)Owen Gallagher
Exceptions registerSEC-01 exceptions log (existing, company-wide); Platform entries tagged platformElena Vasquez
Change recordsJira CHANGE per CH-01Marcus Webb
Incident records + per-service profilesJira Service Management per IM-02; profiles live in each runbook and are registered with the service deskOwen Gallagher
Problem recordsJira PROB per IM-02Owen Gallagher
Backup & restore-test recordsConfluence: Restore Test Log (dated tests, evidence links to S3)Marcus Webb
RAIDD logSection of each Gate 2 record, maintained through deliverySolution Owner per item
Retirement recordsRetirement page per retired service, linked from the service registerMarcus Webb

Stood up by 2026-06-12; existing services back-filled into the service and supplier registers by 2026-06-30 (action: Priya, Marcus).

7. Review cadence (FSD-GV-5)

  • Annually, each June, folded into the Platform team’s existing Q2 planning day (next: June 2027): review the management system, the implementation profile mappings, and the registers; re-ratify the SAC baseline (Dana). Minutes filed under Governance.
  • Monthly, at the existing ops review: the front-door pipeline (what’s parked, what’s stuck at a gate) and anything the registers have flagged (renewals, restore tests due, access reviews).
  • On material change — reorganisation, new regulation, a major incident that implicates the baseline — the affected part is reviewed out of cycle.

Adopted 2026-06-05. First solution through the front door will be whatever next trips a §3 trigger.