AI simulationv0.3Fernbrook Software2026-08

Perspective: a capable engineer with no PM background, following FitSD for the first time, from “I want to propose CertHub” through to a submitted FSD-FRM-01. Reading path taken: README → Quickstart → FSD-PRO → FRM-00/01 → Definitions → SAC reference → Charter §6 → FSD-SC card.

[S1-2a-ENG1-1] The scope test answered “is this for the front door?” in under a minute

  • Kind: worked-well
  • What I needed: to know whether CertHub goes through Solution Development or is just a change.
  • What the standard gave me: FSD-PRO §1’s five in-scope triggers. CertHub trips four unambiguously (new service, new infrastructure, over the local 5-day net-new line, new ongoing burden) and the fifth (“new technology regardless of cost or effort”) would have caught it even if the rest hadn’t. The adoption pack’s scope line (“any net-new shared service we take on”) settled that it’s our front door.
  • What I did about it: nothing — no local call needed.
  • Severity: praise
  • FitSD doc & section: FSD-PRO §1; adoption pack §1/§3
  • Suggested fix: none.

[S1-2a-ENG1-2] The ratified SAC baseline answered the questions I most feared

  • Kind: worked-well
  • What I needed: an availability target, a support model, and a monitoring expectation — the three things a lone engineer cannot invent credibly.
  • What the standard gave me: the SAC mechanism (categories fixed centrally, thresholds ratified once locally, FSD-GV-7) meant the pack’s §4 already held the answers: CertHub matches the Tier 1 definition word for word; the supportability row names the desk, the rota, and the primary-plus-deputy continuity rule; and the monitoring row already mandates monitoring of “expiry-style dates (certificates…)” — the standing baseline had pre-named the exact failure that caused our outage. I designed my scope to a known bar instead of guessing. This is the shift-left the SAC reference doc promises, and it worked.
  • What I did about it: cited the baseline by reference in FRM-00 §2, as the form directs.
  • Severity: praise
  • FitSD doc & section: reference/FitSD — Service Acceptance Criteria; FSD-FRM-00 §2; FSD-GV-7 via adoption pack §4
  • Suggested fix: none.

[S1-2a-ENG1-3] Nobody is obliged to help a submitter — there is no sponsor

  • Kind: gap
  • What I needed: numbers and facts I don’t own: current per-team cert spend, service-desk ticket volume, whether £10–25k/yr SaaS spend is even fundable, and someone to sanity-check key-handling. I also needed to know who I was entitled to ask.
  • What the standard gave me: the roles exist — Contributor (FSD-PRO §3) and Consulted SME (Charter §6) — and the FRM-01 header has a Contributors line. But nothing creates a duty on anyone to respond to a submission, no route to request their time, and no sponsor/champion role for the person raising demand. Charter §5 marks the Tier 3 roles model “later”. I got my inputs because Owen, Elena and Rafi are helpful colleagues on a 5-person-adjacent team; a first-timer in a less friendly org, or one raising demand into a team (which FSD-PRO §1 explicitly invites — “source-agnostic”), could stall exactly here and go back to the corridor.
  • What I did about it: used the adoption pack’s named SMEs and goodwill; wrote “est.” on everything financial and flagged it for Gate 2.
  • Severity: major
  • FitSD doc & section: FSD-PRO §3; Charter §5–§6; FSD-FRM-01 header
  • Suggested fix: one line in FSD-PRO: on submission of an Idea Brief/Gate 1, the Approver brokers the contributor input the record needs (or names why not) — a thin duty, not a new role.

[S1-2a-ENG1-4] Who appoints the Solution Owner?

  • Kind: ambiguity
  • What I needed: to know whether I am the Solution Owner just because I raised the idea and volunteered.
  • What the standard gave me: FSD-PRO §2 defines the role and §1 says a proceeding solution “always has” one on the delivering team — but nothing says how or when the role is assigned. FRM-00 says “Raised by”; FRM-01 suddenly asks for a Solution Owner.
  • What I did about it: self-appointed and wrote “self-nominated at intake; for confirmation at sign-off” in the header.
  • Severity: minor
  • FitSD doc & section: FSD-PRO §1–§3; FSD-FRM-01 header
  • Suggested fix: one line: “the Approver confirms the Solution Owner at Gate 1 sign-off.”

[S1-2a-ENG1-5] The “don’t design anything yet” rule chafed — and earned its keep

  • Kind: worked-well
  • What I needed: permission to write “deploy step-ca” — I arrived with the design itch; the PIR action even sounds like a solution.
  • What the standard gave me: FRM-00’s rule (“Don’t design anything yet… Gate 1 makes the case, Gate 2 designs it”) and the “Outcome sought” prompt (“the outcome, not the design”). Writing the problem without the solution was genuinely uncomfortable for about twenty minutes — and it directly improved Gate 1: because the brief described an outcome rather than a tool, the options table naturally admitted “federate with no central service” and “buy”, which I would never have listed if I’d been allowed to write step-ca on day one. The discomfort is the mechanism working.
  • What I did about it: kept candidate tech out of the brief entirely; it first appears in FRM-01 §5.
  • Severity: praise
  • FitSD doc & section: FSD-FRM-00 preamble and §1
  • Suggested fix: none.

[S1-2a-ENG1-6] Idea Brief vs Gate 1 §1: real overlap, but worth it for a first-timer

  • Kind: friction
  • What I needed: to not write the same thing twice.
  • What the standard gave me: FRM-00 §1 (problem/outcome/scope) reappears almost field-for-field as FRM-01 §1 — “carry forward… confirmed and firmed up”. Of the ~1 hour the brief cost, perhaps 20 minutes was duplicated into Gate 1. The standard is honest that the brief is optional (FSD-PRO §4, Definitions), and for a first submission it was a cheap on-ramp: I could start before I was able to answer the Gate 1 questions, and the §2 SAC reference made me think about quality early. On my second proposal I’d skip straight to FRM-01, which the standard permits.
  • What I did about it: wrote FRM-01 §1 as a genuine firming-up (added ticket volumes, tier claim) rather than a paste.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-00 §1; FSD-FRM-01 §1; FSD-PRO §4
  • Suggested fix: a hint on FRM-00: “if you can already answer Gate 1’s questions, go straight there.”

[S1-2a-ENG1-7] Definitions rescued the jargon — CAPEX/OPEX, T-shirt, MoSCoW

  • Kind: worked-well
  • What I needed: I did not know what CAPEX/OPEX meant, and only vaguely what T-shirt sizing was; MoSCoW (waiting for me at Gate 2) I’d never heard of.
  • What the standard gave me: FitSD — Definitions has plain one-line entries for all three, plus RAIDD, SLO and the rest of what’s coming. The README’s “Stuck on a term?” routing worked. An ordinary engineer can fill FRM-01 §3 from the glossary alone.
  • What I did about it: nothing beyond reading it.
  • Severity: praise
  • FitSD doc & section: FitSD — Definitions (“Common terms & acronyms”); README “How to read this”
  • Suggested fix: none.

[S1-2a-ENG1-8] …but the forms themselves never point at Definitions

  • Kind: friction
  • What I needed: to find the glossary from the form, because in real adoption I’d meet the form first — our Jira intake raises the Confluence template directly; nobody lands on the repo README.
  • What the standard gave me: FRM-01 uses CAPEX/OPEX/T-shirt/MoSCoW inline with no pointer to Definitions. I only knew the glossary existed because I’d read the README path first, which a form-first submitter won’t.
  • What I did about it: nothing — I’d already found it; logging for the submitter who won’t.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 §3; FitSD — Definitions
  • Suggested fix: one line in each form’s preamble: “terms: see FitSD — Definitions.”

[S1-2a-ENG1-9] T-shirt sizes have no anchor, and at Fernbrook the size routes the approval

  • Kind: ambiguity
  • What I needed: to know what S/M/L mean — S relative to a 5-person team? To the company? It matters locally: the adoption pack routes approval to the CTO above £10k/yr, so my OPEX letter effectively chooses the Approver.
  • What the standard gave me: FRM-01 §3 says “Size each as S/M/L with a short note”; Definitions defines T-shirt sizing but no anchors. Fair enough for a portable framework — but the pack didn’t set local anchors either, and the standard never prompted it to (unlike the net-new line, which FSD-PRO §1 explicitly tells you to set).
  • What I did about it: put rough £ ranges in every note column and flagged the option that crosses the £10k line.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 §3; FitSD — Definitions (T-shirt sizing); adoption pack §2
  • Suggested fix: Implementation Guide prompt: “set local S/M/L anchors alongside the net-new line, aligned to your approval thresholds.”

[S1-2a-ENG1-10] §6 assumes one new technology; real proposals adopt several, before the option is chosen

  • Kind: gap
  • What I needed: due diligence for three new dependencies (CA software, Let’s Encrypt, a paid CA account) — and a different set per delivery option, with the option not yet decided at Gate 1.
  • What the standard gave me: FRM-01 §6 is a single field/entry table for “what is being adopted”. A real team under time pressure fills it for the headline tool and lets the quiet dependency slide — and the quiet one here is Let’s Encrypt, a free tier becoming load-bearing with no contract, which is precisely the failure mode the FSD-SC card warns about (“the ‘free tier’ that quietly became load-bearing”). The form’s shape works against the card’s own lesson.
  • What I did about it: repeated the §6 table once per dependency of the preferred option (6a/6b/6c) and noted the deviation on the record.
  • Severity: major
  • FitSD doc & section: FSD-FRM-01 §6; FSD-SC card (“Objective”, “Where it meets Solution Development”)
  • Suggested fix: reword §6: “repeat this table for each new technology, tool or dependency the preferred option adopts.”

[S1-2a-ENG1-11] “The cited obligation or risk record” assumes the risk is already registered

  • Kind: friction
  • What I needed: a risk record to cite for a risk-driven case (FRM-01 §2 says the case rests on it). The cert-management risk was three weeks old and in nobody’s register.
  • What the standard gave me: the instruction to cite a record, with no word on what to do when none exists — the common case for a first-timer, whose proposal usually is the discovery of the risk.
  • What I did about it: raised Platform Risk Register entry RSK-021 at submission and cited it, which felt right but was my invention.
  • Severity: minor
  • FitSD doc & section: FSD-FRM-01 §2; FSD-PRO §5
  • Suggested fix: a form hint: “no standing record? Raise one now and cite it — the proposal is how the risk gets registered.”

[S1-2a-ENG1-12] Time cost and the verdict: about a day, and yes, I’d do it again

  • Kind: worked-well
  • What I needed: the whole thing to cost less than the corridor conversations it replaces.
  • What the standard gave me: actuals — reading the standard cold: ~2 h (the README’s “don’t read it all” routing is why it wasn’t more); Idea Brief: ~1 h (Quickstart’s “half a day, tops” is honest); Gate 1: ~3.5 h writing plus chasing numbers (Quickstart’s “~30 minutes” describes the Approver’s conversation, not the writing — slightly rosy for the submitter, worth a caveat). Total ≈ one working day for a fundable, PoC-scoped proposal. The FRM-01 sections are, almost exactly, the list of questions my corridor pitches have historically died on (“what does it cost to run?”, “who supports it?”, “why now?”) — answered once, in writing, on my own terms. I would do this again unprompted, which is the only adoption metric that matters.
  • What I did about it: n/a.
  • Severity: praise
  • FitSD doc & section: FitSD — Quickstart §1–2; FSD-FRM-01 throughout
  • Suggested fix: Quickstart: say “~30 minutes for the conversation; budget half a day to write it.”